Requested Application Details

Application type:

or
or

Verify your email

We sent a verification code to

Didn't receive the code? Resend

Complete your profile

Email verified. Complete your profile.

CEB SOLAR PHOTOVOLTAIC (PV) SCHEME (HOUSEHOLDS)

APPLICATION FORM
FOR RENEWABLE ENERGY (RE) OF CAPACITY UP TO 10 kW

Instructions for application

Fetch my CEB billing information

Completing Registration

 

0%
CEB Official Documents

Brochures & Official Documents

Download the official documents for each CEB Schemes program

Eligibility criteria, feed-in tariffs, application steps, and key conditions — all official documents published by the Central Electricity Board.

Residential Solar Scheme 2026 SSDG 2026 Residential

Residential Solar Scheme 2026

Hybrid PV + battery installations up to 10 kW for households. Net Metering (Rs 3.00/kWh) or Gross Metering (Rs 4.20/kWh). BESS battery mandatory.

Updated: April 2026

Carbon Neutral Commercial Sector Scheme CNCS 2026 Commercial

Carbon Neutral Commercial Sector Scheme

For large commercial consumers (Tariffs 225 and 225A): shopping centers, hotels, banks. Battery mandatory. Net or Gross Metering.

Updated: January 2026

Medium Scale Distributed Generation — Phase 2 MSDG Phase 2 Commercial

Medium Scale Distributed Generation — Phase 2

Projects from 50 kW to 2 MW for commercial and industrial operators. Gross Metering only — Rs 4.20/kWh. No battery required.

Updated: March 2023

Agrivoltaic Scheme — Phase 2 CAV II — 2025 Agricultural

Agrivoltaic Scheme — Phase 2

Expanded hybrid PV + BESS program. Capacity 500 kW to 4 MW. Reserved for registered planters and farmers. Gross Metering — Rs 5.00/kWh.

Updated: December 2025